Milton Keynes Highways have announced that between 5th July 2020 to 7th December 2020 Buckingham Road will be closed to all traffic under the rail bridge (from the junction at Water Eaton Road to the Brunel Roundabout junction). This is in order to enable East West Rail to carry out replacement of bridge deck on the Bletchley flyover. Whilst the above length of road is closed the alternative route will be via Buckingham Road, Standing Way, Watling Street, Bletcham Way and Saxon Street (and vice versa).
This will take effect at times during the above period only when works are required and only when indicated by the appropriate traffic signs, which will be erected in advance of any closure – please see https://www.facebook.com/BPAResidentsAsst
